we are both back on the boat are 3 weeks away, two weeks were spend on the Chesterfield canal at Staveley build a new lock with Waterway recovery Group if you would like to have a look at what we got up to click the link below  ( make sure you visit every page the blog starts with the last day )
http://waterway-recovery-group.blogspot.co.uk/

also if you click the tis link it will take you to chesterfield canal trust (please donate if you can they need lots more concrete £80 pays 1 cubic meter ) or a hod of bricks is £50
http://www.chesterfield-canal-trust.org.uk/index.php/latest-news/closing-the-gap/589-waterway-recovery-group-camp-at-Staveley

over the two week lots of concrete blocks  were laid down , lots of spoil was removed from the canal bed and Mount Staveley was formed , lots of meters of concrete was pumped and laid , lots of food and drink was consumed , and lots of fun was had by all  ,

After two weeks Tina went back to the boat while I went onto the Pocklington and Driffield canal to so another week with the wrg , I was leading this week (my first time)  , the work at Pocklington was to level and widen the towpath and at Driffield  it was to make a wildness walk along the canal which sound easy but they had to cut their way through thick under growth ,
 when I get some photos of the finished job I will post them  but that is what they had to cut through


 this is pocklington canal tow path before work started

 all these roots were cut out

 the tow path after it been levelled and widen

 the team raking out

 team photo

 

  this was the digger and trailer we used all week
 
we are now heading south to our winter mooring on the Kennet
 and Avon canal at Newbury 