Saturday, 5 March 2011

Firday 4th march

hi all
hope you are all well.
set of from bishop meadow lock after filling up with water , at loughborough lock workman were on a barge with a digger but it was safe to pass so we did . going through loughborough was nice and the sun came out and wind dropped. lots of tree felling has take place as we got nearly Pillings lock we carried on and moored for the night just pass Barrow mill bridge at Barrow-upon-Soar .went shopping nice place.
so that was 5miles and four locks .
o2 is slow  here so photos will follow later .
thanks for looking at our blog and please follow us by adding you name to our followers list
workman working just after Loughborugh lock

leaving Loughborough lock and workman

an old train at the Great Central Railway

some old train in need of work

heron

-life under the arches at Barrow-upon-soar

there was a 3 piece settee under this arch

Barrow deep lock with bridge 29 behind it
or email me if you not sure how to do it c.t.hobbs@talk21.com

2 comments:

thanks for reading our blog and leaving a comment

old pages